Metalwork in the Algarve, the trade known here as serralharia, covers gates and railings, security grilles, handrails and metal stairs, frames for pergolas and canopies, metal doors, and the welding, repair and anticorrosive treatment of all of them. Near the coast, corrosion is what shortens the life of exterior metal, and catching it in time costs less than replacing the piece. Handyman Algarve quotes metalwork in the Algarve for free, in English or Portuguese.
The jobs this covers
- Gates, sliding or swing, new, repaired, or prepared to take automation later.
- Railings and fencing, including replacing the sections lost to corrosion rather than the whole run.
- Security grilles for windows and doors, with the question that is rarely asked: whether one of them needs to open from inside.
- Handrails and balustrades on stairs, terraces and balconies, where the fixing matters as much as the piece.
- Metal structures for pergolas, carports and shade, sized for wind rather than just for load.
- Welding repairs on site where the item cannot leave, with finishing and protection afterwards.
Salt air is what decides the material
Within a few hundred metres of the sea, exterior metal has a different life from the same metal inland. Salt settles, holds moisture against the surface, and gets in through any break in the paint film: a scratch, a drilled hole, a weld that was not properly prepared. That is why the material and the treatment matter more than the thickness of the section. Painted mild steel needs regular maintenance and a touch up as soon as a rust spot appears. Hot dip galvanising buys years. Stainless and aluminium solve it differently, each with its own limits. And whatever the material, the detail that extends life the most is the dullest one: rinsing salt off with fresh water, particularly on hinges, catches and locks.
Fixings, and why railings fail at the wall rather than in the middle
A railing or handrail does not have to break to fail: it can simply come loose, when the fixing into the wall or the floor gives up first. A balustrade takes a horizontal load every time someone leans on it, and a post grouted into a shallow hole in a tiled terrace, or bolted into hollow brick with the wrong plug, transfers that load into something that cannot take it. Fixing into solid concrete, using chemical anchors where the substrate is hollow, and sealing around the base so water does not sit in the hole are what makes the difference. A railing that moves is not cosmetic and should be dealt with as a safety item, not added to a list for next year.
How much does a roller shutter for a shop cost?
As of 2026, a roller shutter for a shop is priced as the sum of the lines of one job, and a figure borrowed from another shopfront misleads, because those lines change from one front to the next. Two kinds close a shop. A security grille is an open lattice curtain: the window stays on show and air passes through. A roller door is a curtain of slats that closes the opening completely. Both wind onto a drum in a box above the opening and run in guides at the sides, and both are serralharia, measured on site and made to the opening. The estore on a house window is a different item.
Manual or motorised is the first decision. A manual door is raised by hand or with a crank; a motorised one is driven by a motor at the drum and worked from a push button, a key switch or a remote. Depending on the model, springs inside the drum balance the weight of the curtain, or the motor moves it alone. Once there is a motor, the controls and who can open the door become part of the job: that side, the motor included, is covered under motorised shop doors and access control in the Algarve.
What moves the price: the width and height of the opening; grille or slats, steel or aluminium; the finish and its protection against salt air; the box, the guides and the bottom rail; the lock; on a motorised door, the motor sized to the weight of the curtain, and its controls; and a supply for the motor from the board, which is an electrician's work. A repair is priced on what has failed: dented slats, a bent guide, the lock, the springs or the motor.
A roller door or grille whose spring or drive has failed can drop. If one has stuck part open, will not stay up or comes down crooked, keep staff and customers out from under it, do not pull it down by hand or force it up, and do not run the motor again, from the button, the key switch or a remote. Switch the power off at the board, at the door's breaker, if reaching the board does not mean passing under the curtain; the backup battery, where one is fitted, is left to the technician, because reaching it can mean climbing up to the box, beside the open curtain. Nobody climbs up to open the box. The springs in the drum are under tension, and unloading or replacing them is a technician's job, done with the curtain secured.
Send a photo taken from the ground, and if the shop cannot be locked up, mark the request as urgent: a request marked urgent is treated as one.
Exemptions, and what your own câmara adds
The national list of works of minor urban relevance, at article 6.º-A of the RJUE, covers boundary walls up to 1.8 m that do not front a public road, and retaining walls that are either up to 2 m high or do not significantly alter the existing ground levels. That is the wording in force since 1 October 2026, in the RJUE as republished by Decreto-Lei n.º 108/2026, and it carries exactly the same words as the wording in force before that date. These exemptions never reach a building, or an ensemble or site containing it, that is classified or in the process of being classified (em vias de classificação), nor a building inside the protection zone of one.
The rules for the start of works changed on 1 October 2026. The RJUE's start-of-works information reaches the câmara municipal at least five days before work starts and names whoever will carry out the work; since 1 October 2026 it expressly includes works exempt from a licence or a comunicação prévia, and since the same date the owner or the works director also posts a notice at the site, visible from the public road, at least five days before work starts (article 80.º-A n.os 1 and 5, in the wording republished by Decreto-Lei n.º 108/2026). Portaria n.º 320/2026/1 of 31 July 2026, in force since 1 October 2026, approves the national form for that information and revised site-notice models. Before that date, Silves and Loulé already required exempt works to be notified to the câmara locally, at least five days ahead; the site notice came with the national text. Anything that changes the appearance of a facade is a question for your own câmara, and in an apartment building for the condominium as well.